Sunday, 7 August 2016

Broughty Ferry Library

 
When I attended my drop in advice surgery yesterday morning at Broughty Ferry Library I was delighted to see that the refurbishment of the teenage section has been completed.
 
The new seating and shelving were installed on Thursday and look really good.This has come about because of the fund raising efforts of the Friends of Broughty Ferry Library. Well done to all concerned.

Wednesday, 3 August 2016

The Great Broughty Ferry Prose and Poetry Competition


Bus stop - Balgillo Road

I have been contacted by residents about the bus stop on Balgillo Road at Ballinard Road. Unlike many bus stops around the city this one has not been raised to allow passengers to walk straight on, which can be problematic for people with mobility issues. 

A city wide programme addressing kerb height at bus stops is being undertaken and I approached the council’s City Development Department to ask that this location be included. The council agreed that a raised kerb would be beneficial and acknowledged that the kerb height is unusually low here.  Busier bus routes are being prioritised but the one in Balgillo road is on the list and will be attended to.

Tuesday, 2 August 2016

Temporary traffic order

I have received notification of a temporary traffic order for Seafield Road as follows:
 
Dundee City Council propose to make an Order under Section 14(1) of the Road Traffic Regulation Act 1984 for the purpose of facilitating gas main renewal works.  The Order is expected to be in force for eight weeks from 15 August 2016.  Its maximum duration in terms of the Act is eighteen months.
 
The effect of the Order is to prohibit temporarily all vehicular traffic in Seafield Road from number 16 to Camperdown Street (southbound) (Phase 1) and from number 16 to Davidson Street (Phase 2).
 
The one-way order relating to Davidson Street will be rescinded for the duration of the works.
 
An alternative route will be available via Seafield Road, Davidson Street, Claypotts Road and Queen Street (Phase 1) and Seafield Road, Church Street, Queen Street, Claypotts Road, Ballinard Road, Balgillo Road and Seafield Road (Phase 2).
 
Please forward any comments you may have regarding this proposal to Mark Cobb, Network Management Team, City Development Department, Dundee House, 50 North Lindsay Street, Dundee  DD1 1LS, no later than five working days prior to the commencement date.  If you have any queries please contact Mr Cobb on 01382 433082.

Thursday, 28 July 2016

Cedar Road-flooding update

I contacted the council following another recent flooding episode in Cedar Road,  near to the junction with Forthill Road,  to find out what progress has be made in getting it sorted. This is something I have been pursuing for a long time and have regular correspondence with the council and Scottish Water about. In recent years the flooding has resulted in a surcharge of sewage.

In response I received this  update from the City Development Department:

As noted in the Local Flood Risk Management Plan, Scottish Water, Dundee City Council, Perth & Kinross and Angus Council are currently working together to deliver a comprehensive Tayside Integrated Catchment Study. The aim of the study is to understand the complex interactions between the various sources and pathways of flooding (surface water, sewers, burns etc) and determine the most appropriate way of reducing flood risk.

The integrated catchment study model is now complete and has identified numerous flood clusters within the catchment area. One such area includes the need for increased sewerage capacity downstream of Cedar Road. The next stage of the study is to prioritise the flood clusters to be taken on to the optioneering stage which considers alternative solutions and costs. Outline design of the selected option will follow including confirmation of the necessary funding. Thereafter, detailed design will be taken forward by the appropriate authority or jointly depending on the solution proposed. Given the necessary preparatory work required, unfortunately it is unlikely that any schemes arising from the Tayside Integrated Catchment Study will be constructed before 2018.

Until the integrated catchment study is fully completed and detailed proposals to resolve sewerage capacity issues are developed, there will continue to be a risk of out of sewer flooding during extreme rainfall events.

Scottish Water have confirmed previously that they will continue to carry out planned sewerage cleaning maintenance and any sewerage system repairs necessary to maintain the current capacity of the sewerage system at Cedar Road. They will also continue to carry out any necessary clean ups of the area if they are made aware of any flooding events. The Scottish Water contact centre telephone number is 0845 601 8855.

Monday, 25 July 2016

Getting things done- Panmurefield Village

I attended a very productive site meeting today with representatives of the environment department and local residents to look at, among other things, the provision and location of litter bins in part of Panmurefield Village.
 
There is concern about the litter that is dropped by some pupils making their way back to school after visiting the shops in Panmurefield during their lunch break. In recent months the residents themselves have carried out their own litter pick and filled a number of rubbish bags.
 
It was agreed that larger bins will be supplied and repositioned to take better account of the route used by the pupils. Hopefully the new school session will see an improvement.