Monday, 15 May 2017

Getting things done-Inckeith Avenue

Sections of pedestrian guardrail on the path between Inckeith Avenue and Inchcolm Drive, which runs to the seven arches viaduct, were taken down and set aside by Tayside Contracts at the request of SGN for the completion of gas works. One section of the guardrail has since been re-erected but another section has yet to be replaced.
 
 
I contacted the council’s roads network management team after concerns were raised with me by local residents and it has arranged for Tayside Contracts to re-erect the outstanding section of pedestrian guardrail.