Wednesday 30 January 2013

A proper reinstatement required

A proper reinstatement still needs to be carried out at this utility box on Brook Street at the corner with Fort Street. I raised the matter with the council’s network management team and was advised that the rough tarmac border at the installation is a temporary measure and it has been arranged for a council engineer to meet the BT contractor to discuss the requirements for the permanent reinstatement using the same granite paving slabs and finish as the adjacent area.
 I have yet to be advised of when the work will be undertaken but I will chase it up if nothing occurs in the near future. I think it is important when any street works are undertaken that the subsequent reinstatement is carried out timeously and to a reasonable standard.