It was brought to my attention that there is damage to a section
of the sea wall at Douglas Terrace. I raised the matter with the city engineer’s
office and was advised that an order for its repair would be issued along
with other coastal repair works being carried out in Broughty Ferry by Tayside
Contracts. The repair work was due to commence today.