I was recently asked by a resident
about the maintenance of the paths in Reres Park, and in particular the deterioration of the
path that runs around the hill on the west side. I raised the matter with the city
engineer’s office and have since been advised that the Road Maintenance
Partnership has carried out an inspection of the paths within Reres Park and
have confirmed that there is a combination of unmade paths and surfaced paths.
The unmade paths are maintained by the Environment Department and the surfaced
paths by the Road Maintenance Partnership who have identified a number of
repairs to be carried out. In the surfaced paths, a number of potholes will be
repaired in the short term and further works will be carried out including
repairs to timber edging as soon as resources are available.
Broughty Ferry
Development Trust is also considering environmental improvements at Reres Park
as a future project.