I’m pleased to report that a pavement I have raised
with the council a few times as needing attention is to be resurfaced this financial
year. The section of pavement on the north side of Dalhousie Road from Guthrie
Terrace to Bridge Street has been scoured away by constant flooding. A length
of linear drainage channel was installed between two existing gullies to deal
with the flooding and now the pavement is to get much needed attention.
The opposite
side of Dalhousie Road from Abercromby Street to Guthrie Terrace is also to be resurfaced,
which is a stretch of pavement that has been mentioned to me by a number of
residents. It is quite a busy bit of pavement as it is used by people who are visiting
the Tesco Express store. A section of Rossie Avenue from Redcastle Crescent is
also to be resurfaced.