Saturday, 4 October 2014

Dundee Road railway bridge


Residents asked me if the ivy on the Dundee Road railway bridge could be cut back a bit as it is impeding the pavement, which is very narrow at this location. I raised the matter with the Roads Maintenance Partnership and in response the city engineer advised me:

‘This bridge was inspected recently and the problem you mentioned was noted. As part of this year's bridges routine maintenance works programme, the vegetation will be cut back to ensure that it does not impede pedestrians. This should be carried out in the near future.’