At the beginning of last year the railway underpass in Gray Street received a much needed makeover. New roof lighting was installed and a full width steel plate walkway was provided at a lower level than the narrow elevated walkway it replaced.
One of the steel plates appears to have become loose as there is considerable bounce in it when people are using it and it makes a pretty loud bang. I have reported it to the city engineer requesting that it be repaired.
I have also mentioned that the surfaces could do with another deep clean, particularly the walls which continue to be stained by the leakage through the bridge deck.