Friday, 28 June 2013

Changes to the bus network

This Sunday will see changes to the bus network as National Express Dundee has revised a number of its services across the city. 
The headline news is the reintroduction of the outer circle service after an absence of around four years.  This will be operated on a commercial basis during the daytime (Monday to Saturday) with evening and Sunday operations being subsidised by Dundee City Council.  The consequence of the outer circle reintroduction is that Service 26 will be withdrawn and Service 14 will be scaled back to a peak time service only (Monday to Friday).
In Broughty Ferry the outer circle service 9, 11 will travel clockwise (downhill) around the Barnhill loop and service 10, 12 will travel anti-clockwise (uphill). 
The frequency of Service 5 is being reduced from 8 buses per hour (every 7-8 minutes) to 6 buses per hour (every 10 minutes).  Half the Service 5 buses will travel on to Ninewells Hospital while half will terminate in the city centre.  Combined with the outer circle, there will be 5 buses per hour, more or less direct, from Barnhill to Ninewells.
The reintroduction of the outer circle will be welcomed by many, particularly those older people in Barnhill and Forthill who, following earlier changes to the bus network, lost a direct route to their medical practices and dental surgeries in the Stobswell area. The outer circle travelling in both directions around the Barnhill loop will also be well received.
A copy of the new bus network map is being distributed to every household in Dundee. The new timetables can be viewed on-line at the National Express Dundee website.

Wednesday, 26 June 2013

Temporary traffic orders

I have been advised of another couple of temporary traffic orders. These are:
1.    Due to carriageway surface dressing, traffic will be prohibited on Dundee Road (from Stannergate roundabout to Ralston Road) on Saturday 29 June 2013 for 2 days. The weekends of 6/7 July and 13/14 July may be used if the works are delayed due to weather conditions. Pedestrian thoroughfare will be maintained. Alternative routes for vehicles are via Craigie Place / Craigie Avenue / Strathern Road / Fairfield Road.

2.    Traffic will be temporarily prohibited on Claypotts Road from Strathern Road to West Queen Street for the purpose of facilitating carriageway resurfacing works.  The Order is expected to be in force for ten days from 15 July 2013. Pedestrian thoroughfare will be maintained. An alternative route will be available via Victoria Road, Dundee Road and West Queen Street.

Tuesday, 25 June 2013

Biomass: council decision

It was agreed at last night’s meeting of the Policy and Resources Committee that the council should object to the proposed biomass plant at Dundee Port.
The effect of the decision is that a public inquiry must now be held which will be able to consider all aspects of the application.
The report considered by the committee had recommended that the council’s position should be that it doesn’t object to it subject to the imposition of conditions and mitigation measures. I put forward the following amendment for consideration by the committee:
‘Dundee City Council objects to the application on the grounds that emissions resulting from the development will exacerbate air quality standards in the city resulting in an adverse impact on public health and the development, by reason of its height, scale and massing, would adversely impact on the visual amenity of the city and would form a discordant feature on the waterfront.’
Cllr. McCready from the Labour Group submitted an identical amendment and during a brief adjournment we agreed that he would move the amendment and I would second him.
When I spoke in support of the amendment amongst other arguments I said that Dundee already has issues with air quality standards and the evidence presented to committee suggested this was likely to be exacerbated should the biomass go ahead.
I also expressed concern about the impact the three large buildings and the main stack would have on the appearance of the city, particularly in such close proximity to the waterfront project. The regeneration of the waterfront is forecast to generate many thousands of jobs for the local economy and V&A Dundee is expected to provide a magnet for business and tourism. I didn’t think it was worth taking the risk of putting any of this at jeopardy.
Consideration of the item took nearly four hours and at the end of the debate the amendment that the council should object was carried by 20 votes to 6.
 

Saturday, 22 June 2013

Bailie Ian Borthwick

I was pleased to be invited to a civic reception last night to recognise Bailie Ian Borthwick’s 50 years as a councillor.  Ian is dedicated and well respected and his record of public service in Dundee is never likely to be repeated. The fact that he was first elected as a councillor before I was even born is amazing. 
In the time I have shared with Ian on Dundee City Council  I have always been impressed by his desire to stand up for what he considers to be fair and reasonable. Despite having different political beliefs Ian has always been generous to me with his advice. I would like to congratulate him on reaching this remarkable milestone.

Wednesday, 19 June 2013

Temporary traffic orders

I have been sent details of two upcoming temporary traffic orders for Broughty Ferry. The first will prohibit the driving of any vehicles in an eastbound direction in Davidson Street (from Seafield Road to Cedar Road) due to footway resurfacing works. This notice comes into effect on Monday 1 July 2013 for 5 working days. Pedestrian thoroughfare will be maintained and access to residents will be maintained where possible. Alternative routes for vehicles are available via Traill Street / Cedar Road.
The second will prohibit the driving of any vehicle in Gray Street (from Queen Street to Brook Street) due to Network Rail maintenance works being carried out. This notice comes into effect on Monday 22 July 2013 at 11pm until Wednesday 24 July at 6am. Pedestrian thoroughfare will be maintained. Alternative routes for vehicles are available via Brook Street / St Vincent Street / Queen Street.

Monday, 17 June 2013

Development Management Committee

Four of the six planning applications decided by the council’s Development Management Committee this evening came from Broughty Ferry. These were two applications to form new driveways in Archer Street, an application to change the use of an area of open space to private garden ground for a property on Arbroath Road and an application for the erection of a modular building at Forthill Primary School to be used by the out of school club. All four applications were unanimously approved by the committee.
The site for the modular unit at Forthill Primary School is in the western corner of the school campus behind the existing school building. It adjoins the playground and is currently an area of unkempt grass land.
Update
Further to the post on 15 June regarding the reinstatement of the grass verge on Arbroath Road, I have been advised that this will be done in the next few weeks, after the spring bulbs die back.  

Saturday, 15 June 2013

Grassed area needs to be reinstated

A number of residents have mentioned to me the condition of the grassed areas on Arbroath Road where trenches were dug earlier this year for the SSE cable renewal works. The ground has been left rough and no grass is growing there. It really needs to be raked over and re-seeded.

I raised the matter with the council’s head of transportation who has advised me that his network management team will take it up with SSE. Hopefully this will see the grass being reinstated to the way it was before the works commenced. The posted picture shows part of the line of the trench on the grassed area between Fairfield Road and the north pedestrian entrance to Dundee College.